THE 1999 GRAND MASTER'S WORK PROJECT
WORKING WITH OBION COUNTY HFH http://www.gmwp.org/1999/obion.html revised 10/30/99 | ||
|
Framing Day--September 11, 1999 | |||
| |||
|
contributed by Brother Ben Norrid Brothers,
Saturday (September 18) morning started out very cool, temp. near 50--great weather. Another large group showed up to work. The main project for the day was siding. Over three quarters of the siding was put up before materials ran out. Side projects that turned into major accomplishment was insulation and dry wall, all of which was completed except what had to be left open for the plumber. Also both outside doors and the last window were installed. We are ahead of schedule!!! The
remaining schedule is as follows:
Sept. 25 and Oct. 2 Finish dry wall work and siding, start on interior trim with primer coat of paint. Oct. 9 and 16 Lay vinyl, prime walls and 1st coat of paint, hang interior doors and trim cut. Oct. 23 and 30 Final coat of paint and install cabinets. Other projects that will be worked on between now and Oct. 30, Electrical, plumbing, heating & air finished and inspected. Driveway and sidewalks formed and poured. And landscaping and carpet laid. It's amazing how much is getting done so quickly. Remember we are ahead of schedule so the above is subject to change. If you can come by and at least take a look. The recipient of this house, Angie McClure, is very nice and hard working. I believe she is really deserving of this house. Please pass this information along. I believe we are doing a great deed here. | |||